Moving the largest load in West Australian mining history!
- MPi Life
Over six days four prime mover trucks towed a fully assembled Liebherr 996 excavator weighing more then 675 tonnes.
Over six days four prime mover trucks towed a fully assembled Liebherr 996 excavator weighing more then 675 tonnes.
The machine was from Fortescue’s Christmas Creek mine to its Solomon operations.
They travelled at speeds of 4km/hr over gravel, thanks to an additional two trucks pushing the load, and reached speeds of 6km/hr on roads.
Hauling the load the 230km to the mine took them six days, (including time spent being bogged, which was only recitified with the help of four front end loaders) working up to 15 hours per day.
It was moved on 24 twin-axle (384) Goldholfer platforms.
Related articles
How to juggle parenthood with a mining job...
-
FIFO
-
Lifestyle
-
MPi Life
Reflect, recharge, restart
-
MPi Life
-
MPi News
How to juggle parenthood with a mining job...
- FIFO
- Lifestyle
- MPi Life
Reflect, recharge, restart
- MPi Life
- MPi News